Skip to content
Anton Muckel Gerüstbau GmbH

Anton Muckel Gerüstbau, Linnich

Scaffolding in Jülich

Façade scaffolds, suspended scaffolds, heavy duty scaffolds and bespoke structures. Our yard stands in Linnich, in the same district, just north of the town. Tell us what has to be built and we will measure it on site.

  • Façade and interior scaffolds
  • Suspended and heavy duty scaffolds
  • Bespoke structures and roof overs
Suspended working deck of a scaffold beneath a bridge superstructure, with red and white traffic barriers on the carriageway in front of it.
Underpass, suspended working and protection deck
01 The range

What we build in Jülich

A scaffold is a workplace. It has to stand where the work is, it has to carry whatever goes on it, and it has to be gone once the building is finished. Our range is sorted by that.

01 Façade scaffolds For new build, refurbishment, painting and roofing. Single and two family houses as readily as multi storey blocks.
02 Interior and modular scaffolds Built inside, where ceilings, stairwells or halls have to be reached from below.
03 Suspended scaffolds Hung rather than stood up, when the space underneath has to stay clear. Bridge soffits and overhangs are the usual case.
04 Mobile towers On castors, for short jobs inside and out.
05 Heavy duty scaffolds For where loads have to be caught or propped, not merely people carried.
06 Industrial scaffolds For plant, vessels, silos and halls, including during operation.
07 Bespoke structures and roof overs Where no standard build fits, the structure is planned and sheeted for that one case.
08 Stair towers and escape stairs The safe way up, and the way down if it ever matters.
09 Stage building Platforms and grandstands for events.
10 Equipment hire Hoists with and without passenger carriage, telehandlers with attachments, and a lorry with a loading crane and container body.

Not seeing what you need? Ask for it.

Ask about a service
02 Over traffic

Scaffolds with the traffic still running underneath

Not every site sits on open ground. Under a bridge, inside an underpass or beside a road that has to stay open, the scaffold decides whether the work can happen at all.

The working deck is then suspended or caught from the side rather than stood up off the ground. The decking is closed so that nothing can fall through, and the area under the structure is secured before anyone climbs up.

The pictures on this page show exactly that case: a suspended working and protection deck beneath a bridge superstructure, caught at the abutment, with the barriers on the carriageway in front of it.

Suspended
The space below stays open to traffic and on foot.
Closed decking
The deck catches what would otherwise fall.
Secured
Barriers and warning lamps steer the traffic around the structure.

Ask about a project

Scaffold under a bridge superstructure inside an underpass, the working deck spans the full width, with traffic barriers in front.
03 How it runs

Four steps to a scaffold

  1. 01

    Enquiry

    You write what has to be built, where it stands and from when. One photograph says more than a long description.

  2. 02

    Site measure

    We look at the spot: ground, access, height, anchoring, everything that decides the structure.

  3. 03

    Quotation

    You get the scope in writing, with the services and the standing time, before anything is built.

  4. 04

    Erection

    Once erected it is checked, tagged and handed over. On the agreed date we take it down again.

04 Enquiry

Tell us what has to be built

Three entries are enough to start: your name, a telephone number and one sentence about the site. Everything else we settle at the site measure.

Reachable directly

If it needs to be quicker, pick up the phone. We answer it ourselves.

Telephone
+49 2462 2822
Fax
+49 2462 74577
Registered office
Im Gansbruch 22, 52441 Linnich

Enquiries sent through this form reach us as an email.

05 Pictures

From the job

Four frames of one underpass, where a suspended working and protection deck was built beneath the bridge superstructure.

Suspended working deck under the superstructure, the carriageway secured in front of it.
The deck spans the full width of the superstructure.
Caught from the side at the abutment, barriers on the wet carriageway.
The back of the structure at the pier, with the passage still open behind it.

Photographs from our own work. Click to enlarge.

06 Area

Jülich and Kreis Düren

Seen from Linnich, Jülich is the next town along. We build in the centre, in the villages and in the industrial estates, and we travel within the same district when a site sits further out.

Whether your address is on the list is settled faster by one call than by any list.

Send an enquiry

Jülich and its villages

  • Jülich centre
  • Koslar
  • Barmen
  • Broich
  • Welldorf
  • Stetternich
  • Merzenhausen
  • Kirchberg
  • Bourheim
  • Selgersdorf
  • Mersch
  • Pattern
  • Lich-Steinstraß
  • Altenburg
  • Güsten
  • Daubenrath

And across Kreis Düren

  • Linnich
  • Aldenhoven
  • Titz
  • Niederzier
  • Inden
  • Düren
07 Questions

Asked often

Call us Send an enquiry